Page 1 - Soil_Builder_SB_0113_Z_0815
P. 1

SOIL BUILDER

• Advanced Solutions to High Residue Problems
• Even Residue Distribution to Enhance Water Intake

  and Air Exchange for Decomposition
• Preserve Valuable Topsoil from Wind and Water Erosion
• 5 to 13 Shank Rigid Frame Models Available
• 20” Cutting Coulters on 7 ½” Spacing
• Dual Nested Spring Reset Shank Assemblies
• Parabolic-Shaped Chisel Shanks

                           www.brillionfarmeq.com
   1   2   3   4